Installation of an Onsite Wastewater Treatment System
This video is a timelapse showing the installation of a BIOROCK non-electric Onsite Wastewater Treatment System. The system can be installed on new builds or as a replacement for an exisitng septic tank.
This BIOROCK advanced Secondary Treatment system requires no electricity to produce excellent effluent quality. The start up period is 24 Hours, and the system can cope with varying loadings and long absence periods (suited to intermittently used holiday homes). It is light weight and easily transportable to remote locations.
The maintenance is minimal and cost effective, the system has no moving parts, and makes no noise when operating.