Depending on how good or bad your builder was, you may end up with less than you expected. This is where the snaglist comes in – an inspection report highlighting defects in an existing home or recently completed project.
House building projects should ideally be completed to the standards stated, but they often aren’t. Even on a house that’s been completed by a professional builder with quality systems in place, 20 to 30 ‘snags’ are to be expected. An average three-bedroom house with a standard finish might average 50 to 80 items that will need correcting while a house built with little oversight may result in 100 to 150. For those of you who are still in the dark about the concept of a snaglist, it is defined as an inventory of the small pieces of work – commonly known as snags – that need to be finished at the end of the build. The word ‘small’ is somewhat misleading as new homes and extensions can present serious flaws that should have been picked up by the builder’s finishing foreman or staff.What items are on a snaglist?
Any visible defect is documented in the snaglist. Other issues that may be recorded include work not completed in keeping with best practice, e.g. the quality of workmanship in laying brick pavers. Photographs may be pasted into the report to document issues such as leaks or uneven flooring levels. Unintended damage by trades people is a common issue, as are materials not having been given time to dry out or forced to acclimatise too quickly which can lead to defects appearing.
The issue of oversight
When buying a second-hand house the advice is to have it properly surveyed and inspected, which is a prudent move, the same when buying a second-hand car whereby we get an independent mechanic to check it for us. But doesn’t it seem rather absurd to have to get a new house snagged and even more so to have to pay extra money to make sure the house is defect free? Surely it is up to the builder to highlight imperfections and correct them, a pre-delivery inspection if you like.
It’s time to stop accepting poor standards
Unfortunately it appears to be part of our make up to accept poor standards; we do not like to complain and rather than make a fuss, we allow ourselves to be cheated from what we are legally and perfectly entitled to. It is reasonable for you to expect that your self-build project will be finished to a good standard and have a quality finish. Of course house building is not like a car production line where quality control standards can be maintained. Don’t expect perfection as this is impossible, there will always be some defects, but these should be kept to a minimum and barely noticeable (won’t catch your eye). The point at which to have cause for concern is when there is a high level of imperfections or there are items that don’t function. For instance, in the case of a €400,000 extension where the builder is owed €40,000 for the completion of the work, you may be reluctant to hand the money over if the house was poorly finished, e.g. foul drains overflowing onto the driveway during a party, leaking central heating plumbing resulting in brown water marks on the kitchen ceiling, foul smells emanating from the traps in the showers every time the toilets are flushed, badly scratched glazing on some of the newly installed windows, poor finishes to the paintwork generally, water tanks in the loft installed in breach of current Building Regulations, new plumbing which was not electrically bonded at the sinks, etc.
Cost of snaglist?
You may do your own snaglist but don’t be penny wise and pound foolish, it’s a job usually best left to a professional. Costs generally range from £150/€200 to £350/€400; the scale (usually based on property size and location) and complexity will determine the fee. It is generally accepted as good practice to obtain three written quotes when looking for a snaglist professional to compare like with like. The benefit to you will be immediately apparent when you receive the report as you’ll soon realise the cost of repairing the problems highlighted may run 10 to 100 times the fee charged for the survey. While snaglists do not provide costings, they form a sound basis for separate third party contractor or builder to give you an idea of how much you will have to spend to repair the defects.Recourse
When you engage the services of a builder you will generally enter into a legally binding contract with him. You will offer to pay an agreed sum of money and, in return, he will agree to provide you with the services and expertise required to build your house. Providing you honour your part of the contract you are entitled to expect the builder to honour his. There are always changes as the build progresses so it is extremely important to tell your builder about these in good time, and in writing. This may constitute a variation to the contract and it is quite common. However, any changes may have time and cost implications. At completion, the house should be what you expected, and that includes a good standard of build and finish quality. If not, then the builder has not delivered his part of the bargain and a way for you to provide evidence is to rely on your independent snaglist report. In ROI consumer contracts are protected by the Sale of Goods and Supply of Services Act, 1980 but as previous experience from defects at Priory Hall have shown, it can be difficult to get recourse in all instances. Insurance policies in the form of bonds include the NHBC (NI) and Homebond (ROI) but these only cover the structure for 10 years and the building envelope for five. The fine print and terms and conditions may lead to payment not being made. From individual suppliers, you can generally get a one year workmanship guarantee and for appliances/systems a one to five years’ manufacturer’s warranty on the product.Adapted from original article by Rory O Connor C/Eng MIEI, Dip Law, with updates from Michael Fleming of Conspect Engineering www.dublinsurveys.com and www.conspect.ie Disclaimer: this article is for reference only; always seek professional advice when dealing with building and legal matters.