Self-build Excel Sheets: Download construction schedules and budgeting sheets

Image by Jan from Pixabay

A round up of self-build excel sheets, for budgeting and construction schedules, as featured in Selfbuild magazine, with linkbacks to the projects.

In this post, we cover:

  • Excel sheets of construction schedules
  • Excel sheets for budgeting a self-build

Last Update: December 2024


This first schedule brings you through the Pre Design and Design stages of your self-build:


This construction schedule is from Louis Gunnigan who built his dream home to retire to; project details here.


This budgeting schedule is from Grafficar, who featured as a project here


This renovation construction schedule is from Barry McCarron’s passive house retrofit project profiled here


Model house costs 2023 by Mark Brinkley – House Builder’s Bible 15th Edition

As featured in the Build Cost Guide 2023


For sample workbooks and work schedules, see below a handy guide by Philip Fitzpatrick.


Read up on how to create a build schedule here

Share and Enjoy !

Shares

Written by Astrid Madsen

Astrid Madsen is the editor of the SelfBuild magazine. Email astrid.madsen@selfbuild.ie

Cost effective ways to insulate

What to do before you start on site